Wastewater treatment plant flow has shown a decline compared to 2021 and now falls below the historical average. 2021 winter maximum was influenced by an atmospheric river and the 2022 data shows this returning in line with 2020 results.
Helps to ensure usage remains within current treatment capacity and to support plans for potential upgrades.
Measures treatment volume daily – track max volumes by season against capacity. Winter maximum is show as this is the season with the highest waste treatment flows.
You have not added any content to your favorites yet.