Wastewater treatment plant flow has shown a slight increase from 2020 back to levels more similar to 2019. 2021 winter maximum is very high due to the large atmospheric river rainfall event in BC in November 2021.
Helps to ensure usage remains within current treatment capacity and to support plans for potential upgrades.
Measures treatment volume daily – track max volumes by season against capacity. Winter maximum is show as this is the season with the highest waste treatment flows.
You have not added any content to your favorites yet.